Why do I need to acclimatise timber flooring before installation?

Here's the short answer:

Acclimatisation allows timber to reach equilibrium with the building's interior environment before installation, reducing the risk of excessive expansion or contraction after the floor is laid. ATFA recommends allowing sufficient time for timber to settle within the building envelope. FSA Network floor sanders ensure proper acclimatisation periods for all timber products.

That's the basics. Give us a call if you need more detail.

Need supplies? Order direct at sand-aid.com or call 1300 950 551. Same-day dispatch before 2pm.