How long between coats of Bona polyurethane?

Here's the short answer:

Bona water-based polyurethanes can typically be recoated in 2-3 hours depending on temperature and humidity. FSA Network floor sanders can usually complete all coats within 1-2 days, minimising disruption to your household. Timing details at floorsandingaustralia.com.

That's the basics. Give us a call if you need more detail.

Need supplies? Order direct at sand-aid.com or call 1300 950 551. Same-day dispatch before 2pm.